PTTCO has Full Accreditation for IWCF and IADC Well Control Training
at center in Pattaya, Bangkok, Thailand and Kuala Lumpur, Malaysia
Sararit working at drilling mud lab in Thailand
IWCF Malaysia, 28 - 01/05/08 IWCF Well Intervention Pressure Control Well Intervention, BLUE SKY HOTEL, BALIKPAPAN (IO 624) , 05 - 09/05/08 IWCF Well Intervention Pressure Control Well Intervention, Quality Hotel Singapore (SG 590) , 05 - 09/05/08 IWCF Drilling Well Control Sertifiserings liste boring 2008 Singapore , 12 - 16/05/08 IWCF Well Intervention Pressure Control Well Intervention Hotel Papandayan Bandung, Indonesia (IO 554) , 19 - 23/05/08 IWCF Drilling Well Control Sertifiserings liste boring 2006 Bangkok , 19 - 23/05/08 IADC WellCAP Well Control BANGKOK, THAILAND , 26 - 30/05/08 IWCF Drilling Well Control Sertifiserings liste boring 2007 (PTTCo, Saville Park Suites, Perth, Australia) , 02 - 06/06/08 IWCF Well Intervention Pressure Control Well Intervention Bangkok 2007 (TH 591) , 09 - 13/06/08 IWCF Well Intervention Pressure
Control Well Intervention, LABUAN, MALAYSIA (MA 628) , 09 - 13/06/08 IWCF Drilling Well Control Sertifiserings liste boring 2008 (PTTCo, Grand Kemang Hotel, Jakarta) - IO627 , 16 - 20/06/08 IWCF Drilling Well Control Sertifiserings liste boring 2006 Bangkok , 23 - 27/06/08 IADC WellCAP Well Control BANGKOK, THAILAND , 07 - 11/07/08 IWCF Drilling Well Control Sertifiserings liste boring 2008 Singapore , 14 - 18/07/08 IWCF Drilling Well Control Sertifiserings liste boring 2007 (PTTCo, Vung Tau, Vietnam) - VN617 , 14 - 18/07/08 IADC WellCAP Well Control BANGKOK, THAILAND , 21 - 25/07/08 IWCF Drilling Well Control Sertifiserings liste boring 2006 Bangkok , 28 - 01/08/08 IWCF Drilling Well Control Sertifiserings liste boring 2008 (PTTCo, Grand Kemang Hotel, Jakarta) - IO627 , 04 - 08/08/08 IWCF Well Intervention Pressure Control Well Intervention Bangkok 2007
(TH 591) , 11 - 13/08/08 IWCF Drilling Well Control Sertifiserings liste boring 2008 Jakarta (IO 625) INDONESIA , 11 - 15/08/08 IWCF Drilling Well Control Sertifiserings liste boring 2008 Singapore , 12 - 16/08/08 IWCF Well Intervention Pressure Control Well Intervention Hotel Papandayan Bandung, Indonesia (IO 554) , 18 - 22/08/08 IWCF Drilling Well Control Sertifiserings liste boring 2006 Bangkok , 25 - 29/08/08 IWCF Drilling Well Control Sertifiserings liste boring 2008 (PTTCo, Grand Kemang Hotel, Jakarta) - IO627 , 25 - 29/08/08 IADC WellCAP Well Control BANGKOK, THAILAND , 08 - 12/09/08 IADC WellCAP Well Control VUNGTAU, VIETNAM , 15 - 19/09/08 IWCF Drilling Well Control Sertifiserings liste boring 2008 Singapore , 22 - 26/09/08 IWCF Drilling Well Control Sertifiserings liste boring 2006 Bangkok , 29 - 03/10/08 IADC WellCAP Well Control BANGKOK,
THAILAND , 06 - 10/10/08 IWCF Drilling Well Control Sertifiserings liste boring 2008 Singapore , 06 - 10/10/08 IADC WellCAP Well Control KUALALUMPUR, MALAYSIA , 13 - 17/10/08 IADC WellCAP Well Control KUALALUMPUR, MALAYSIA , 20 - 22/10/08 IWCF Drilling Well Control Sertifiserings liste boring 2008 Jakarta (IO 625) INDONESIA , 20 - 24/10/08 IWCF Drilling Well Control Sertifiserings liste boring 2006 Bangkok , 03 - 06/11/08 IWCF Well Intervention Pressure Control Well Intervention PTTCO, Terengganu, Malaysia (MA 576) , 03 - 07/11/08 IADC WellCAP Well Control BANGKOK, THAILAND , 10 - 13/11/08 IWCF Well Intervention Pressure Control Well Intervention PTTCO, Terengganu, Malaysia (MA 576) , 10 - 14/11/08 IWCF Drilling Well Control Sertifiserings liste boring 2008 Singapore , 17 - 21/11/08 IWCF Drilling Well Control Sertifiserings liste boring 2006
30/01/2010 IADC WellCAP Well Control BANGKOK, THAILAND , 02 - 06/02/2010 IWCF Drilling Well Control PTTCO, PATTAYA, THAILAND (TH609) , 09 - 12/02/2010 IWCF Well Intervention Pressure Control PTTCO,BP JAKARTA, INDONESIA NOT Grand Kemang Hotel ANYMORE (IO627) , 16 - 19/02/2010 IWCF Drilling Well Control PTTCO, OPI BUILDING, JAKARTA, INDONESIA (IO625) , 16 - 20/02/2010 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, TH548 , 16 - 20/02/2010 IADC WellCAP Well Control BANGKOK, THAILAND , 23 - 27/02/2010 IWCF Well Intervention Pressure Control PTTCO, THE EMERALD HOTEL, TH548 (REV 1) , 23 - 27/02/2010 IADC WellCAP Well Control JOHOR BAHRU, MALAYSIA , 02 - 06/03/2010 IWCF Drilling Well Control PTTCO, VUNG TAU, VIETNAM (VN617) , 09 - 13/03/2010 IWCF Drilling Well Control PTTCO, BUNDUNG, INDONESIA (IO561) , 09 - 13/03/2010
IADC WellCAP Well Control BANGKOK, THAILAND , 09 - 16/03/2010 IWCF Drilling Well Control PTTCO, OPI BUILDING, JAKARTA, INDONESIA (IO 625) , 16 - 20/03/2010 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, TH548 , 16 - 20/03/2010 IADC WellCAP Well Control BANGKOK, THAILAND , 23 - 27/03/2010 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, TH548 , 23 - 27/03/2010 IADC WellCAP Well Control BANGKOK, THAILAND , 06 - 10/04/2010 IWCF Well Intervention Pressure Control PTTCO, THE EMERALD HOTEL, TH548 (REV2) , 06 - 10/04/2010 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, TH548 , 13 - 20/04/2010 IWCF Well Intervention Pressure Control PTTCO, HALLIBURTON OFFICE, JAKARTA, INDONESIA (REV 2) , 20 - 24/04/2010 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, TH548 , 20 - 24/04/2010 IADC WellCAP Well Control BANGKOK,
THAILAND , 27 - 30/04/2010 IWCF Drilling Well Control PTTCO, Kuala Lumpur, Malaysia MA 660 , 04 - 08/05/2010 IWCF Drilling Well Control PTTCO, BALI, INDONESIA (IO592) (REV 1) , 11 - 12/05/2010 IWCF Drilling Well Control PTTCO, OPI BUILDING, JAKARTA, INDONESIA (IO 625) , 11 - 15/05/2010 IWCF Well Intervention Pressure Control PTTCO, THE EMERALD HOTEL, TH548 , 11 - 15/05/2010 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, TH548 , 11 - 15/05/2010 IADC WellCAP Well Control BANGKOK, THAILAND , 18 - 22/05/2010 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, TH548 (REV 1) , 25 - 26/05/2010 IWCF Drilling Well Control PTTCO, OPI BUILDING, JAKARTA, INDONESIA (IO 625) (REV 1) , 25 - 29/05/2010 IWCF Drilling Well Control PTTCO, AMARI ORCHID RESORT -TOWER, PATTAYA, THAILAND (TH609) (REV 2) , 25 - 29/05/2010 IADC WellCAP Well
Control PATTAYA,THAILAND , 01 - 05/06/2010 IWCF Well Intervention Pressure Control PTTCO, THE EMERALD HOTEL, TH548 , 01 - 05/06/2010 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, TH548 , 08 - 11/06/2010 IWCF Well Intervention Pressure Control PTTCO, Kuala Lumpur, Malaysia (MA 660) , 08 - 12/06/2010 IWCF Drilling Well Control PTTCO, Kuala Lumpur, Malaysia MA 660 , 15 - 19/06/2010 IWCF Well Intervention Pressure Control PTTCO, THE EMERALD HOTEL, TH548 , 15 - 19/06/2010 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, TH548 (REV 2) , 15 - 19/06/2010 IADC WellCAP Well Control BANGKOK, THAILAND , 22 - 26/06/2010 IWCF Well Intervention Pressure Control PTTCO, Grand Kemang Hotel, Jakarta, Indonesia (IO668) (REV 2) , 22 - 26/06/2010 IADC WellCAP Well Control BANGKOK, THAILAND , 06 - 10/07/2010 IWCF Drilling Well
Control PTTCO, PATTAYA, THAILAND (TH 609) , 13 - 17/07/2010 IWCF Well Intervention Pressure Control PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH 548) , 13 - 17/07/2010 IWCF Well Intervention Pressure Control _PTTCO, Kuala Lumpur, Malaysia (MA 660) , 13 - 17/07/2010 IWCF Drilling Well Control PTTCO, Kuala Lumpur, Malaysia (MA 660) , 13 - 17/07/2010 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH 548) , 13 - 17/07/2010 IADC WellCAP Well Control KUALALUMPUR, MALAYSIA , 20 - 24/07/2010 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH 548) , 20 - 24/07/2010 IADC WellCAP Well Control BANGKOK, THAILAND , 27 - 31/07/2010 IWCF Drilling Well Control PTTCO, PATTAYA, THAILAND (TH 609) , 27 - 31/07/2010 IADC WellCAP Well Control PATTAYA,THAILAND , 03 - 07/08/2010 IWCF Well
Intervention Pressure Control PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH 548) , 03 - 07/08/2010 IWCF Drilling Well Control PTTCO, Kuala Lumpur, Malaysia MA 660 , 03 - 07/08/2010 IWCF Drilling Well Control PTTCO, OPI BUILDING, JAKARTA, INDONESIA (IO 625) , 10 - 14/08/2010 IWCF Well Intervention Pressure Control PTTCO, BALI, INDONESIA (IO 592) (REV 1) , 10 - 14/08/2010 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH 548) (REV 1) , 10 - 14/08/2010 IADC WellCAP Well Control BANGKOK, THAILAND , 17 - 21/08/2010 IWCF Well Intervention Pressure Control PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH 548) , 17 - 21/08/2010 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH 548) , 17 - 21/08/2010 IADC WellCAP Well Control BANGKOK, THAILAND , 24 - 28/08/2010 IWCF Drilling
Well Control PTTCO, Kuala Lumpur, Malaysia MA 660 , 31 - 04/09/2010 IWCF Drilling Well Control PTTCO, PATTAYA, THAILAND (TH 609) , 31 - 04/09/2010 IADC WellCAP Well Control PATTAYA,THAILAND , 07 - 11/09/2010 IWCF Drilling Well Control PTTCO, Kuala Lumpur, Malaysia MA 660 , Well Control Kuala Lumpur, Well Control KL, Well Control Malaysia, 07 - 11/09/2010 IADC WellCAP Well Control KUALALUMPUR, MALAYSIA , 14 - 18/09/2010 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH 548) , 14 - 18/09/2010 IADC WellCAP Well Control BANGKOK, THAILAND , 21 - 25/09/2010 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH 548) , 25 - 29/09/2010 IWCF Well Intervention Pressure Control Opi Building, Jakarta, Indonesia , 28 - 05/10/2010 IWCF Drilling Well Control PTTCO, KUALA LUMPUR, MALAYSIA , 05 -
09/10/2010 IWCF Well Intervention Pressure Control PTTCO, KOTA KINABALU, MALAYSIA , 05 - 09/10/2010 IADC WellCAP Well Control KUALALUMPUR, MALAYSIA , 12 - 13/10/2010 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH 548) (REV 1) , 12 - 13/10/2010 IADC WellCAP Well Control BANGKOK, THAILAND , 12 - 16/10/2010 IWCF Well Intervention Pressure Control PTTCO, BALI, INDONESIA (IO 592) (REV 1) , 12 - 16/10/2010 IWCF Drilling Well Control PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH 548) , 12 - 16/10/2010 IADC WellCAP Well Control BANGKOK, THAILAND , 19 - 23/10/2010 IWCF Well Intervention Pressure Control PTTCO, THE EMERALD HOTEL, BANGKOK, THAILAND (TH 548) , 26 - 30/10/2010 IWCF Well Intervention Pressure Control Pttco,Opi Building, Jakarta, Indonesia , 26 - 30/10/2010 IWCF Drilling Well Control
PTTCO, PATTAYA, THAILAND (TH 609) , 26 - 30/10/2010 IADC WellCAP Well Control PATTAYA, THAILAND (TH 609) , 29 - 03/11/2010 IWCF Well Intervention Pressure Control Bali, Indonesia , 02 - 06/11/2010 IWCF Well Intervention Pressure Control Kuala Lumpur, Malaysia , 02 - 06/11/2010 IWCF Drilling Well Control Kuala Lumpur, Malaysia , 02 - 06/11/2010 IADC WellCAP Well Control Kuala Lumpur, Malaysia , 09 - 13/11/2010 IWCF Well Intervention Pressure Control Bali Indonesia , 09 - 13/11/2010 IWCF Drilling Well Control Bangkok, Thailand , 09 - 13/11/2010 IADC WellCAP Well Control Bangkok, Thailand , 15 - 19/11/2010 IWCF Well Intervention Pressure Control PTTCO, LTD.,KOTA KINABALU, MALAYSIA , 16 - 20/11/2010 IADC WellCAP Well Control BANGKOK, THAILAND , 22 - 26/11/2010 IWCF Well Intervention Pressure Control Opi Building, Jakarta, Indonesia , 22 -
26/11/2010 IWCF Well Intervention Pressure Control Kuala Lumpur, Malaysia , 22 - 26/11/2010 IWCF Drilling Well Control Kuala Lumpur, Malaysia , 30 - 04/12/2010 IWCF Drilling Well Control Pattaya, Thailand , 30 - 04/12/2010 IADC WellCAP Well Control Bangkok, Thailand , 07 - 11/12/2010 IWCF Well Intervention Pressure Control Bali Indonesia , 07 - 11/12/2010 IWCF Drilling Well Control Kuala Lumpur, Malaysia , 07 - 11/12/2010 IADC WellCAP Well Control Kuala Lumpur, Malaysia , 14 - 18/12/2010 IWCF Drilling Well Control Bangkok, Thailand , 14 - 18/12/2010 IADC WellCAP Well Control Bangkok, Thailand , 21 - 25/12/2010 IWCF Well Intervention Pressure Control Bangkok Thailand , 21 - 25/12/2010 IWCF Drilling Well Control Bangkok, Thailand. IWCf Kuala Lumpur, IWCF Malaysia, IWCF Singapore, IWCF Jakarta, IWCF Indonesia, IWCF Vietnam, IWCF Australia,
IWCF Perth, Well Control Bangkok, Well Control Australia, Well Intervention Thailand, Well Intervention Perth, Well Intervention Jakarta, Well Intervention Well Control, Well Intervention Kuala Lumpur, Well Intervention Indonesia, Well Intervention Bangkok, Well Control Training, IWCF Well Control School, Well Control Kuala Lumpur, Well Control KL, Well Control Malaysia, IWCF KL, Well Control Vietnam, Well Control Singapore, Well Control Jakarta, Well Control Indonesia, Well Control Thailand, Well Control Perth, Well Intervention Australia, Well Control Courses, IWCF Training, Well Control School, Well Intervention Bangkok, Well Intervention Malaysia, Well Intervention Vietnam, Well Intervention Indonesia, Well Intervention Singapore, IWCF/IADC Well Control Training, IWCF/IADC Coil Tubing, IWCF/IADC Snubbing, IWCF/IADC/ -Wireline, IWCF/IADC Well Completion,
IWCF/IADC Drilling/Workover, Coil Tubing Well Control, Snubbing Well Control, Wire Line Well Control, Work Over Well Control, Drilling Well Control, IWCF Training Courses, IWCF/IADC Well Control in Kuala Lumpur Malaysia, Jakarta Indonesia, Singapore, Hochiminh HCM City Vietnam. Combined surface/subsea, Driller/Fundamental/Supervisor at KL Malaysia Bali Bandung Balikpapan Indonesia, Vung Tau Vietnam, Perth Australia, and Brunei. IWCF/IADC Well Control Malaysia/Indonesia/Vietnam/Singapore/Australia. -Level1 Wireline -Coiled Tubing Operations, Level1 Wireline -Snubbing Operations,Level1 Coiled Tubing Operations, Level1 Coiled Tubing Operations -Snubbing Operations, Level1 Snubbing Operations, Level1 Combined Operations, Level2 Wireline Operations, Level2 Wireline -Coiled Tubing Operations, Level2 Wireline -Snubbing Operations, Level2 Coiled Tubing Operations, Level2 Coiled Tubing
Operations -Snubbing Operations, Level2 Snubbing Operations, Level2 Combined Operations, Surface, Driller, Drilling, Surface, Supervisor, Drilling, PTTCO Basic Well Control, Combined Surface -Subsea, Driller, Drilling, Combined Surface -Subsea, Supervisor, Drilling , Surface, Fundamental, Drilling, Surface, Supervisor, Drilling, Combined Surface -Subsea, Fundamental, Drilling, Combined Surface -Subsea, Supervisor, Drilling.
Lex Lim: "Basic competency in
well control is important in the oil
and gas industry to prevent
blowouts and mitigate well control
problems"


Bangkok Office

PTTCO LTD.

54/3 Moo 13, Navamin 70
Buengkum, Bangkok 10240, Thailand
Tel: +662 947 8259
Fax: +662 510 3808, +662 510 6195
E-mail: info@pttco.org
www.pttco.org
Bangkok Training Location

THE EMERALD HOTEL
99/1 Ratchadapisek Road, Din Daeng, Bangkok 10400
Thailand. Tel. + 66 (2) 2764567 Fax + 66 (2) 276 4555-6
www.emeraldhotel.com



Pattaya Training Location

HOTEL J PATTAYA

221 Moo 6, North Pattaya, Pattaya City Chonburi 20150
Thailand

Tel: +66 (0) 3842 3620 – 1, +66 (0) 3842 3730 Fax: +66
3842 3731
E-mail: info@hoteljpattaya.com
www.hoteljpattaya.com
Kuala Lumpur Training Location

HOTEL ISTANA KUALA LUMPUR

73, Jalan Raja Chulan
50200 Kuala Lumpur, Malaysia
T : +603.2141.9988 F : +603.2144.0111
E : general@hotelistana.com.my
www.hotelistana.com.my


PTTCO operates under full accreditation of IWCF and IADC for
Well Control Certification Programs at Driller and Supervisor level.
PTTCO arranges frequent training program in drilling, well servicing, well intervention,
workover, completion, wireline, snubbing, coiled tubing, blow out prevention BOP
Course,combined surface and subsea BOP stack, at our training centers in
Kuala Lumpur, Malaysia and Pattaya, Bangkok, Thailand.


Who should attend ?

He/She acquires the required competency from IADC or IWCF,
Drilling Representatives, Drilling Superintendent,  Drilling Supervisors, Subsea Engineers,
Drilling Engineers, Tool Pusher, Driller, Assistant Driller,
Well Construction Engineer, Mud Engineer, Rig Manager, Barge Master,
Well Services Operator/Technician, who desire IWCF or IADC certification and for those
who want a thorough knowledge of well control techniques and drilling safety.


Duration 5 days

Course Overview: Basic introductory principles and theory of well control along with the most
commonly used well control techniques. IWCF and IADC Certification is awarded upon
successful completion
at Supervisor or Driller level for surface and subsea BOP stack.


Course Outline/Content:

This course focuses on Surface and Subsea BOP control system operating philosophy,
Well control Principle and Procedure (P&P) and Blow out Preventer Equipment (BOPE), Basic
terms, BHP, Leak Off test, Kick Indications, Shut-In Procedures, Well Killing Methods,
Problem During Circulating out Kick, Subsea BOP Control Systems,
well control written tests and
Simulator Training/Practice/Assessment.


Bangkok Office

PTTCO LTD.

54/3 M13, Navamin 70
Buengkum, Bangkok 10240, Thailand
Mobile: +6681 920 3318
Tel: +662 947 8259
Fax: +662 510 3808, +662 510 6195
Email: info@pttco.org
www.pttco.org
Bangkok Training Location

THE EMERALD HOTEL
99/1 Ratchadapisek Road, Din Daeng, Bangkok 10400
Thailand. Tel. + 66 (2) 2764567 Fax + 66 (2) 276 4555-6
www.emeraldhotel.com



Pattaya Training Location

HOTEL J PATTAYA

221 Moo 6, North Pattaya, Pattaya City Chonburi 20150
Thailand

Tel: +66 (0) 3842 3620 – 1, +66 (0) 3842 3730 Fax: +66
3842 3731
Email: info@hoteljpattaya.com
www.hoteljpattaya.com
Kuala Lumpur Training Location

HOTEL ISTANA KUALA LUMPUR

73, Jalan Raja Chulan
50200 Kuala Lumpur, Malaysia
T : +603.2141.9988 F : +603.2144.0111
Email : general@hotelistana.com.my
www.hotelistana.com.my
"Our well control instructors come from engineering and
operational backgrounds and have real practical world
well control experience"
IWCF Well Intervention Pressure Control certification
training course in PTTCO session.
Javeed Shaikh: "How the simulator can
enhance and improve well control classroom
delivery?"
Sararit Daeng Pongpitak ( Sit, Middle): "Both IADC
and IWCF Drilling and Intervention Well Control
certification programs provide the required basic
competency standards of well control training"
"Our well control certification training course
materials are constantly updated in original graphic color,
relevant and easy to understand for our
IWCF and IADC courses"
Lex Lim is well control instructor at courses
offering internationally renowned well control
certificates from IADC and IWCF. Lex’s
experience includes work as research
associate at the New Mexico Petroleum
Recovery Research Center. Other areas of his
research work include drilling and mud
technology, reservoir characterization studies,
relative permeability analysis, mobilization of
residual oil, effect of crude-oil-induced
wettability on oil recovery, and enhanced
recovery employing surfactant and alkaline
flooding. He holds a BS and MS degree in
Petroleum engineering from New Mexico
Institute of Mining and Technology, USA.
Apart from this his command over many
languages such as Bahasa Malaysia,
Chinese,…....makes him unique instructor  to
train well control in South East Asia.